Experience

 

 

  1. GTPP Caltex Minas 9

EPC of 34 MW Gas Turbine Generator Frame 6, 115 kV Substation, and all associated Equipment at Caltex Minas Power Plant No.9.

Construction Period: Jun ‘93-Dec ‘94

Project Cost: US$14,750,000

Owner: PT.Caltex Pacific Indonesia (Chevron)

 

  1. GTPP Caltex Minas 10

EPC of 34 MW Gas Turbine Generator Frame 6, 115 kV Substation and all associated Equipment at Caltex Minas Power Plant No. 10.

Construction Period : Dec ‘93-Apr ‘95

Project Cost : US$12,900,000

Owner : PT.Caltex Pacific Indonesia (Chevron)

 

  1. GTPP Pontianak

EPC and Maintenance of 34 MW Gas Turbine Generator Frame 6, 115 kV Substation, and all associated Equipment at PLN Pontianak.

Construction Period : May ‘96-Jan ‘98

Maintenance Period : Jan ‘98-Jan ‘99

Project Cost : US$13,500,000

Owner : PT. PLN (Persero)

 

 

  1. GTPP Widuri

EPC and O&M of 2×20 MW Gas Turbine Generator Frame 5, and all associated Equipment at Jack Up Platform Seafox 3, Widuri CNOOC SES LTD.

Construction Period : Jun ‘00-Aug ‘02

Project Cost : US$30,000,000

Operation Period : Nov ‘01-Aug ‘12

Owner : PT. Kwartadaya Dirganusa

Partner : Seafox BV.

 

 

  1. GTPP Lhokseumawe

EPC and O&M of 20 MW Gas Turbine Generator GE Frame 5  and all associated Equipment at Pupuk Iskandar Muda, Lhokseumawe.

Construction Period : Sep ‘02-Aug ‘03

Project Cost : US$10,000,000

Operation Period : Aug ‘03-Aug ‘13

Owner : PT. Kwartadaya Dirganusa

 

 

  1. GTPP PUB Singapore

Engineering and Construction Supervision of 2×34 MW Gas Turbine Generator Frame 6 and all associated Equipment at PUB Plant Changi, Singapore.

Construction Period : Nov ’02-Mar ‘04

Operation period : Mar ’04-Mar ’06

Project Cost : US$1,000,000

Owner :  PUB Singapore

 

 

  1. GTPP Tanjung Batu

EPC of 20 MW Gas Turbine

Generator, Rolls Royce RB 211, 150 kV
Substation and all associated Equipment at PLN Tanjung Batu Unit 3 – Samarinda.

Construction Period : Jan ’02-Mar ’03

Project Cost : US$12,700,000

Owner : PT Menamas Mitra Energi

 

  1. CCPP Panaran I

EPC of 2×25 MW Gas Turbine Generator RB 211, 150 KV
Substation and all associated Equipment at PLN Batam Panaran Phase I.

Construction Period : Aug ’03-Aug ’04

Project Cost : US$30,000,000

Owner : PT Mitra Energi Batam

 

 

  1. CCPP Panaran II

EPC and O&M of 2×25 MW Gas Turbine Generator RB 211, 150 KV
Substation and all associated Equipment at PLN Batam Panaran Phase II.

Construction Period : Jan ‘05-Aug ‘05

Operation period : Aug ‘05-Aug ‘15

Project Cost : US$   31,000,000

Owner :  PT Dalle Energy Batam

 

 

  1. CCPP Teluk Lembu

EPC and O&M of 20 MW Gas Turbine Generator GE Frame 5 at PLN Teluk Lembu I, Pekanbaru.

Construction Period : Sep ’04-Sep ‘05

Operation period : Sep ’05-Sep ’15

Project Cost : US$  2,000,000

Owner : PT Riau Power

 

 

  1. CCPP Tambak Lorok

MFO-nization Combined Cycle Power Plant 450MW at PLN Tambak Lorok, Semarang.

Construction Period : Aug’08 – Apr’09

Project Cost : US$ 20,000,000

Partner : Thommasen Intl./Modaco Enersys

Owner : PT. Indonesia Power

 

 

  1. GEPP Panaran

EPC of 20-25MW Gas Engine Power Plant Bergen Rolls Royce and all associated Equipment at PT Pelayanan Listrik  Nasional  Batam – Panaran

Construction Period : Sept.’11–Nov.’12

Project Cost : US$20,000,000

Owner : PT. PLN Batam

Contractor : Consortium Medco-Dalle-TDIL

 

 

  1. GTPP Tanjung Uncang

EPC of 2x35MW Gas Turbine Power Plant Frame 6 and all associated Equipment at  PT. Energi Listrik Batam – Tanjung Uncang, Batam

Construction Period : Sept.’12–Dec. ‘14

Project Cost : US$28,000,000

Owner : PT. Energi Listrik Batam

Partner : Medco Power Indonesia

 

 

  1. Cogen Cibitung

EPC and Maintenance of Fajar Surya Wisesa Cogeneration Plant, Consists of 34 MW Gas Turbine Generator Frame 6,
Heat Recovery Steam Generator, 150 kV Substation and all associated Equipment at Fajar Surya Wisesa  Cibitung Paper Plant.

Construction Period : Sep ’94-Sep ’95

Maintenance Period : Spe ‘95-Sep ‘96

Project Cost : US$16,000,000

Owner : PT. Fajar Surya Wisesa

 

 

  1. Cogen Citeureup

EPC for Repowering Electrical Project 75MW at PT. Indocement Tunggal Prakarsa, Tbk. Citeureup, Bogor.

Construction Period : Apr ’15 – Feb’16

Project Cost : US$ 14,000,000

Patner : Siemens

Owner : PT Indocement

 
  1. GPP Dieng

Construction of Geothermal Power Plant  Ansaldo 55MW and all associated Equipment at Dieng California Energy.

Construction Period : Apr ’96-Dec ’97

Project Cost : US$ 10,000,000

Owner : California Energy (Geodipa)

Partner : Kiewit Holt Intl.

 

 

  1. GPP Darajat

Construction of Darajat  Geothermal Power Plant Mitsubishi 70 MW  and all  associated   Equipment at Amoseas Darajat.

Construction Period : Aug ‘97-Aug ’98

Project Cost : US$ 6,000,000

Owner : Amoseas (Chevron)

Partner : Hyundai/ Stone & Webster

 

 

  1. CSPP Pacitan

EPC of 2×300 MW Coal Steam Power Plant and all associated Equipment at PLN Sudimoro, Pacitan, Jatim.

Construction Period : Aug’07 – Aug’12

Project Cost : US$576,000,000

O&M : PT. PLN PJB

Partner : Dongfang Electric Corp.

Owner :  PT. PLN (Persero)

 

 

  1. CSPP Lontar

EPC of 3×300 MW Coal Steam Power Plant and all associated Equipment at PLN Lontar, Teluk Naga, Banten.

Construction Period : Aug’07 – Aug’12

Project Cost : US$820,000,000

O&M : PT. Indonesia      Power

Partner : Dongfang Electric Corp.

Owner :  PT. PLN (Persero)

 

  1. Caltex Central Gathering Station

EPC of Central Gathering Station No.10 at Caltex Duri.

Construction Period : Apr ’99-Apr ’01

Project Cost : US$45,000,000

Owner :PT.Caltex  Pacific Indonesia (Chevron)

 

  1. Arco Pagerungan LPG Plant

EPC of LPG PLANT and GAS COMPRESSION 6.2 MMSCFD at ARCO Pagerungan Besar Island.

Construction Period : Oct ’95-Dec ’97

Project Cost : US$6,000,000

Owner : ARCO

 

  1. Tuban Desulfurization Plant

Construction of Desulfurization Plant at Santa Fe Tuban.

Construction Period : Oct ’98-Jul ’99

Project Cost : US$1,000,000

Owner : Santa Fe

 

  1. Caltex Degassing Station

Construction of Automatic Well Testing and Degassing Station at Caltex Duri

Construction Period : Feb ’00-Apr ‘01

Project Cost : US$3,000,000

Owner : PT. Caltex Pacific Indonesia (Chevron)

 

  1. Rewulu New Gantry System

EPC for New Gantry System (NGS) an End to End Data Automation (ETEDA) at Terminal BBM Rewulu – Yogyakarta

Construction Period : Nov ’14-Oct ’15

Project Cost : US$6,000,000

Owner : Pertamina Patra Niaga, Dwi Sura Prima (DSP)

 

  1. Pengapon New Gantry System

EPC for New Gantry System (NGS) at Terminal BBM Pengapon – Semarang

Construction Periode : Jul ’15-Jun ’16

Project Cost : US$5,000,000

Owner : Pertamina Patra Niaga, Dwi Sura Prima (DSP)

 

  1. Minas Substation

EPC of 115 kV 8 Delta Substation at CALTEX MINAS

Construction Period : Jun ’97-Feb ’98

Project Cost : US$1,800,000

Owner : PT. Caltex Pacific Indonesia (Chevron)

 

  1. Caltex Duri Pipe Line

Construction of South Gas Pipe Line 7Km, 24 Including Civil Work at Caltex Duri

Construction Period : Mar.’00-Jul.’00

Project Cost : US$600,000

Owner : PT. Caltex Pacific Indonesia (Chevron)

Contact Us
✉ Email : info@dalleenergy.com
☎ Phone : +62-21-29661626
☎ Phone : +62-21-29657973
☎ WhatsApp : +62-811-178881
Office Hour : 09.00am-05.00pm
Address
Alamanda Tower, 25th Floor
Jl. TB Simatupang Kav.23-24
Jakarta 12430, Indonesia