Hydropower has proven its advantages, such as 100% clean energy, high reliability and availability, high efficiency, low maintenance costs and capability to adjust the generation output.
Large hydropower potential in Indonesia is about 75 GW, while only 4.2 GW or less than 6% have been utilized so far. Small hydro potentials, which have been identified could provide electric power capacity equal to 1359 MW. Currently, less than 200 MW has been utilized for power generation.
So, there is undeveloped potential for Large hydropower for about 90% and for Small Hydropower is 80%.
From business view, hydro power plant especially small scale is an attractive and simple pricing structure and relatively high acceptability among local people.
Dalle Energy through Dalle Hydro Energy plans to develop 200 MW Hydropower Plant. Currently, DHE have 5 Small Hydro Projects with 30 MW total capacity and identified several good location as well as continuously looking other prospective area for Small Hydro Project.
MINI HYDRO PROJECTS
PROJECT CRITERIA
Water Way (WW)
Max 2,000m
Debit (D)
Minimum 6 m3 / sec
Head (H)
Min 60 m
Distance to PLN transmission
Max 2,000 m
Access road distance
Max 2,000 m
Location
Below conservation forest
Geological
Stable land / Non earthquake region and Non karst land
Partners
CIKASO HYDRO POWER PLANT 5.3 MW
SUMMARY TECHNICAL DATA
Criteria
PLTM Cikaso
Water Way
Max 2000m
257 m
Debit
Minimum 3 m3 / sec
16.5 m3 / sec
Head
Min 60 m
40 m
Distance to PLN transmission
Max 2,000 m
1000 m
Access road distance
Max 2,000 m
600 m
CILAKI HYDRO POWER PLANT 8 MW
SUMMARY TECHNICAL DATA
Criteria
PLTM Cilaki
Water Way
Max 2000m
2100 m
Debit
Minimum 3 m3 / sec
8.2 m3 / sec
Head
Min 60 m
105 m
Distance to PLN transmission
Max 2,000 m
100 m
Access road distance
Max 2,000 m
50 m
SELAMET HYDRO POWER PLANT 4X1,5 MW
SUMMARY PICTURE
Tongoa HYDRO POWER PLANT 5 MW
TECHNICAL DATA
SUMMARY
Water Way
1950 m
Debit
7.2 m3 / sec
Head
85 m
Distance to PLN transmission
300 m
Access road distance
100 m
URING GAYO HYDRO POWER PLANT 9 MW
SUMMARY TECHNICAL DATA
Water Way
3870 m
Debit
9.1 m3 / sec
Head
140 m
Distance to PLN transmission
100 m
Access road distance
50 m
SUMMARY SUMMARY SUMMARYCIANJUR HYDRO POWER PLANT 3×10 MW
Besay 1 & 2 HYDRO POWER PLANT 2 x 10 MW
Pakenjeng HYDRO POWER PLANT 3.6 MW
ECONOMIC SUMMARY
This document is the property and copyrights of PT. DALLE ENERGY. The material in this document, is not allowed to be opened in part or whole without written permission from PT. DALLE ENERGY. No part of document is allowed to be duplicated in any form other than the purpose, and must be returned upon request to PT. DALLE ENERGY.