EPC of 34MW Gas Turbine Generator Frame 6, 115 kV Substation, and all Associate Equipment at Caltex Minas Power Plant No.9.
- Construction Period : Jun ‘93-Dec ‘94
- Project Cost : US$ 14,750,000
- Owner : PT.Caltex Pacific Indonesia (Chevron)