EPC of 34 MW Gas Turbine Generator Frame 6, 115 kV Substation and all Associate Equipment at Caltex Minas Power Plant No. 10.
- Construction Period : Dec ‘93-Apr ‘95
- Project Cost : US$ 12,900,000
- Owner : PT.Caltex Pacific Indonesia (Chevron)
EPC of 34 MW Gas Turbine Generator Frame 6, 115 kV Substation and all Associate Equipment at Caltex Minas Power Plant No. 10.